Both 600 and 800 spectrometers are operational.
July 2025 M T W T F S S « Nov 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 -
Recent Posts
Categories
Both 600 and 800 spectrometers are operational.
You might have encountered some difficulties with Autolock on the I400 and I500 due to a Lockphase change after the last week’s power outage. This problem has been fixed.
After the power outage today.
Chemistry NMR will be available 24/7 as usual and will be unstaffed Mon. 12/26, Thurs. 12/29 and Fri. 12/30.
The old Lexmark printer for the i400 has been replaced by a new HP Laserjet printer. The old printer is now installed on the i500 for light-duty jobs.
The Chemistry NMR lab was getting warm on Saturday due to a problem on the building temp control system for this area. The room temperature has been back to normal today. All spectrometers are operational.
Due to the malfunctioning compressor for the 600 cold probe, 600 is not operational.
Both the Chemistry and Simon NMR facilities will be unstaffed on November 24th & 25th.
A new printer was installed for the 300.
ITG has fixed their backup configuration problem. The 500 and 400s are completely back to normal service.