The problem of the building air control system has been fixed. All the NMR spectrometers are up running at 11:30pm.
Thank Sarah Lindahl for timely reporting the problem.
The problem of the building air control system has been fixed. All the NMR spectrometers are up running at 11:30pm.
Thank Sarah Lindahl for timely reporting the problem.