Annual services of the coldprobes of V800 and V600 are scheduled on November 25 – 27. These two spectrometers will not be available to users during this period of time. Please plan accordingly.
Update: last night (Nov. 18) there was a problem on the building compressed air supply, which caused both 800 and 600 coldprobes warmed up. So, both systems are unavailable from now until Nov. 28 9am.