The 4-nucleus PFG probe is back from repair and has been installed on the I400. All four nuclei (1H, 13C, 19F, and 31P) work well.
The 4-nucleus PFG probe is back from repair and has been installed on the I400. All four nuclei (1H, 13C, 19F, and 31P) work well.