February 2025 M T W T F S S « Nov 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 -
Recent Posts
Categories
Author Archives: chemweb
Gem300 printer unavailable
The Gem300 printer doesn’t work duo to its dead network card. A new card has been ordered. Please use the other printers before this printer gets fixed. Continue reading
Posted in Uncategorized
Comments Off on Gem300 printer unavailable
4-Nucleus Probe Installed on I400
The 4-nucleus PFG probe is back from repair and has been installed on the I400. All four nuclei (1H, 13C, 19F, and 31P) work well. Continue reading
Posted in Uncategorized
Comments Off on 4-Nucleus Probe Installed on I400
Find z0 fixed
Find z0 has been calibrated on the I500, I400 and VXR400. So the standard procedure can be used: 1) Select solvent and experiment 2) Find z0 3) Gradient shim 4) Autolock or manual lock 5) Acquire You can still use … Continue reading
Posted in Uncategorized
Comments Off on Find z0 fixed
Downtime of Chemistry Spectromters
Due to lab air outage, the spectrometers in the Chemistry NMR facility will be shut down Tuesday (July 26th) morning 5:30-8:30am. Continue reading
Posted in Uncategorized
Comments Off on Downtime of Chemistry Spectromters
Gem300 data access from workstations improved
The button on the top of the file tool which corresponds to the 300 is now marked with user’s three-letter username. Clicking on this button will directly access user’s home folder on gem300. Continue reading
Posted in Uncategorized
Comments Off on Gem300 data access from workstations improved
Unstaffed July 4th
The NMR facility will be unstaffed on July 4th. Continue reading
Posted in Uncategorized
Comments Off on Unstaffed July 4th
I400 probe being repaired
The I400 4-Nucleus probe is being sent for repair. It typically take about 6 weeks for a probe repair. The PFG inverse detection probe is now in. Versus the PFG probe, this probe: – * cannot do 19F and 31P … Continue reading
Posted in Uncategorized
Comments Off on I400 probe being repaired
Spectrometers back up
The drain valve of the air dryer went bad and needs to be replaced. A new valve has been ordered and will come soon. For time being, the old valve is used after clean up to keep the spectrometers running. Hopefully it … Continue reading
Posted in Uncategorized
Comments Off on Spectrometers back up
Chemistry spectrometers down
We have a problem with the lab air dryer. The spectrometers in the Chemistry NMR facility are temporarily down. Continue reading
Posted in Uncategorized
Comments Off on Chemistry spectrometers down
I400 update
13C and 31P are ok, 1H and 19F work at reduced S/N and longer pulse widths. Probe default values have been updated but proton decoupling for 13C may be affected. 2D experiments should be run on the VXR400 and I500 … Continue reading
Posted in Uncategorized
Comments Off on I400 update